Skip to content

Experience

Projects handed over to operation

Every skid below was designed, manufactured and handed over for the specific conditions of its site. Clients, years and equipment types are listed as delivered.

  1. Heat exchanger skid
    012026

    Heat exchanger skid

    A fully factory-assembled heat exchange skid on a base frame, with insulated piping, shut-off valves and service platforms.

    Client
    Ukrgazvydobuvannya JSC
    Year
    2026
  2. Gas preparation skid
    022021

    Gas preparation skid

    A gas preparation skid for well tie-in arrangement — process piping, shut-off valves and metering assemblies on a single frame.

    Client
    Regal Petroleum Corporation Limited, representative office
    Facility
    Well No. 61, Svyrydivske field
    Year
    2021
  3. Inhibitor dosing pump skid
    032024

    Inhibitor dosing pump skid

    An inhibitor dosing skid in a protective enclosure with a service platform, prepared for transport to site.

    Client
    Naftogazdiya LLC, DTEK
    Facility
    Mayorivka gas treatment plant
    Year
    2024
  4. Dosing pump skid
    042023

    Dosing pump skid

    A dosing pump skid with a control panel and stainless steel piping, installed at an operating gas treatment plant.

    Client
    Naftogazvydobuvannya PJSC
    Facility
    Runovshchyna gas treatment plant
    Year
    2023
  5. Formation water pump skid
    052022

    Formation water pump skid

    A formation water transfer pump skid under a canopy, with filters, shut-off valves and electric drives.

    Client
    Naftogazvydobuvannya PJSC
    Facility
    Runovshchyna gas treatment plant
    Year
    2022
  6. Liquid degassing unit
    062020

    Liquid degassing unit

    A liquid degassing unit with a horizontal vessel, process piping and a system of shut-off and control valves.

    Client
    Ukrgazvydobutok JSC
    Year
    2020

Need a similar solution for your facility?

Tell us about the task and we will assess the scope of work and timelines.